+91 90440 86207aimsurveyservice@gmail.comNaini, Prayagraj · Serving North & Central India
AIM Survey & Planning Consultant
  1. Home
  2. Services
  3. Infrastructure corridors & utilities
  4. Road, rail & pipeline routes
Infrastructure corridors & utilities

Route survey for roads, railways & pipelines

Alignment, strip survey and sections for linear projects of any length.

Strip plan in AutoCADL-section and cross-sectionsAlignment coordinates
Total station mounted on a rail trolley

Overview

Linear projects need a continuous, well-controlled survey along the whole route. We survey highways, railways, pipelines, canals and transmission lines with DGPS control, total station, drone and road and rail LiDAR.

For railways we work with total stations mounted on rail trolleys. For road DPRs we also carry out traffic volume counts (TVC).

Why it matters

Highways, railways and pipelines are long, and small errors repeat over many kilometres. A consistent corridor survey on one datum keeps alignment, levels and quantities reliable from start to end.

Our methodology

  1. Recce and control along the route
  2. Alignment and strip survey
  3. Sections at set chainages
  4. Crossing details
  5. Drafting and checks

Equipment & technology

GNSS / DGPS & RTKLeica GS16, Trimble R8s± 10 mm + 1 ppm (static control)
Total stationsLeica TS06, Sokkia CX-105± 5 mm + 2 ppm
Drones / UAVDJI Matrice 350 RTK, Matrice 300, Phantom 4 RTK; senseFly eBee X fixed-wing± 2–5 cm horizontal with GCPs
LiDARDJI Zenmuse L2 drone LiDAR; handheld LiDAR scannerPoint cloud (LAS / XYZ)

Applications

New roads, widening and DPRsRailway lines and sidingsWater, gas and sewer pipelines (including JJM)Canals and drainsTransmission lines

Deliverables

  • Strip plan in AutoCAD
  • L-section and cross-sections
  • Alignment coordinates
  • ROW demarcation plan
  • Earthwork quantities on request

From our work

Project highlights include a 120 km National Highway corridor topographic survey in Uttar Pradesh, route survey for the Prayagraj–Varanasi state highway section, and engineering surveys for railway over-bridges and under-bridges.

Questions

Can you work on live railway tracks?

Track surveys are done with the railway's permission and safety arrangements. We plan the work around their block timings.

Do you provide traffic volume counts?

Yes. Traffic volume count (TVC) and traffic surveys are available for road projects, DPRs and feasibility studies.

How long a corridor can you take up?

Any length. Long corridors are planned in sections with continuous control, so the drawings join without gaps.

Request a quote

Get a quote for road, railway & pipeline route survey

Send the basics and our team will reply with questions or a clear, itemised quotation.

Send project details

Fields marked * are required.

Your details are used only to reply to this enquiry. See our Privacy Policy.

Thank you. Your enquiry has been sent.

Our team will contact you on the number you shared. For a faster reply you can also send the same details on WhatsApp.